供應(yīng)商評(píng)審表審核表單
《供應(yīng)商評(píng)審表審核表單》由會(huì)員分享,可在線(xiàn)閱讀,更多相關(guān)《供應(yīng)商評(píng)審表審核表單(22頁(yè)珍藏版)》請(qǐng)?jiān)谘b配圖網(wǎng)上搜索。
1、 檢檢查查表表供供應(yīng)應(yīng)商商質(zhì)質(zhì)量量審審核核 Checklistsupplier audit供應(yīng)商名稱(chēng)/supplier name:產(chǎn)品型號(hào)/part no:審核日期/audit date:1、平平面面布布置置圖圖和和過(guò)過(guò)程程流流程程圖圖/Plant Layout and Process Flow DiagramNO.文文 件件 要要 求求/document questions評(píng)評(píng)價(jià)價(jià)evaluate記記錄錄/comments1.1是否有最新版平面布置圖?is there a dated copy of the current floor plan readily available?1.2平面
2、布置圖上是否有所有裝配、生產(chǎn)和檢測(cè)崗位、原材料、半成品、成品的區(qū)域劃分?does the floor plan identify the following:all required assembly,process and inspectionstations?locations for all raw material,work in process(WIP)and finished product?1.3流程圖是否是最新版本的并標(biāo)注有日期?are process flowcharts dated and current?操操 作作 要要 求求/implementation/process
3、 questions1.4生產(chǎn)過(guò)程中,材料和產(chǎn)品流動(dòng)是否與過(guò)程流程圖一致?does the actual material and production flow follow the process flowchart?2、設(shè)設(shè)計(jì)計(jì)和和過(guò)過(guò)程程FMEA/design and process FMEANO.文文 件件 要要 求求/document questions評(píng)評(píng)價(jià)價(jià)evaluate記記錄錄/comments DFMEA(含含有有設(shè)設(shè)計(jì)計(jì)職職責(zé)責(zé))/DFMEA(if supplier is design responsible)2.1DFMEA的零件編號(hào)、修訂版本、原始日期和審定日期是否
4、正確?does the DFMEA have the correct Part#,Revision Level,Orig.Date and Rev.Date?2.2DFMEA是否包括了顧客的所有性能要求、外觀(guān)標(biāo)準(zhǔn)、特殊特性和安全要求?does the DFMEA include all functional specifications,appearance specifications,SCs andSafety Requirements as defined by customer drawings?2.3是否對(duì)每個(gè)失效模式的RPN都進(jìn)行了計(jì)算,并對(duì)RPN值高的采取了建議措施?are th
5、ere RPN calculations for each failure mode and recommended actions for high RPNs?第 1 頁(yè),共 22 頁(yè)P(yáng)FMEA2.4PFMEA是否按圖紙的規(guī)定包括了所有顧客和內(nèi)部要求的特殊特性和安全要求?does the PFMEA include all customer and interal Scs and Safety Requirements as defined bycustomer drawings and interal requirements?2.5是否對(duì)每個(gè)失效模式的RPN都進(jìn)行了計(jì)算,并對(duì)RPN值高的
6、采取了建議措施?are there RPN calculations for each failure mode and recommended actions for high RPNs?2.6PFMEA是否與流程圖一致?Does the PFMEA follow the process flow?3、控控制制計(jì)計(jì)劃劃/Control PlanNO.文文 件件 要要 求求/document questions評(píng)評(píng)價(jià)價(jià)evaluate記記錄錄/comments3.1控制計(jì)劃是否有正確的產(chǎn)品編號(hào)、修訂號(hào)、原始日期和修訂日期?Does the Control Plan have the corre
7、ct Part#,Revision Level,Orig.Date and Rev.Date?3.2控制計(jì)劃是否與流程圖一致?Does the control plan follow the process flowchart?3.3控制計(jì)劃內(nèi)是否包括了:進(jìn)料檢驗(yàn)、過(guò)程檢驗(yàn)和控制、出廠(chǎng)檢驗(yàn)以及返工/返修要求?Does the Control Plan include the following:Incoming Inspection,In-processInspection&Controls,Final inspection and rework/repair Requirements?3.4
8、控制計(jì)劃是否按顧客圖紙的要求包括了所有顧客的特殊特性和產(chǎn)品安全要求?Does the Control Plan include all the customer SCs and Safety Requirements asdefined by customer drawings?3.5PFMEA中視別的潛在失效模式是否通過(guò)控制計(jì)劃進(jìn)行得到控制?Are appropriate potential failure modes,as identified in the PFMEA,addressedthrough the control plan?3.6控制計(jì)劃中是否包括了檢驗(yàn)和試驗(yàn)的要求?(包括數(shù)
9、量、頻次、以及規(guī)范要求)檢檢查查表表供供應(yīng)應(yīng)商商質(zhì)質(zhì)量量審審核核 Checklistsupplier audit供應(yīng)商名稱(chēng)/supplier name:產(chǎn)品型號(hào)/part no:審核日期/audit date:第 2 頁(yè),共 22 頁(yè)Does Control Plan include both gage and test requirements?(including quantity,frequency,and required specifications?)操操 作作 要要 求求/implementation/process questions3.7所有控制計(jì)劃中要求的控制(包括SPC)
10、是否在生產(chǎn)過(guò)程中得到實(shí)施?Are all controls(including SPC),identified on the Control Plan,being used in theproduction process?3.8所有控制是否得到定期驗(yàn)證以確保達(dá)到預(yù)期的結(jié)果?Are all controls verified on a periodic basis to ensure desired results?4、檢檢驗(yàn)驗(yàn)和和試試驗(yàn)驗(yàn)/Inspection and TestingNO.文文 件件 要要 求求/document questions評(píng)評(píng)價(jià)價(jià)evaluate記記錄錄/comme
11、nts4.1接受準(zhǔn)則不是零缺陷的計(jì)數(shù)數(shù)據(jù),供方是否將接受準(zhǔn)則形成文件并由顧客批準(zhǔn)?for attribute data with acceptance criteria other than zero defects,doesthe supplier document acceptance criteria and have customer approval?4.2是否只有被檢查和驗(yàn)證過(guò)的產(chǎn)品才能夠被投入生產(chǎn)?how does the supplier assure that incoming product has been inspected orotherwise verified t
12、o meet requirements,prior to release for production?4.3沒(méi)有驗(yàn)證而用于生產(chǎn)的的原材料是否被明確標(biāo)識(shí)并作好記錄?is positive identification provided and recorded for material used in production butnot verified?4.4檢驗(yàn)指導(dǎo)書(shū)中是否包括抽樣計(jì)劃、檢驗(yàn)頻次以及檢測(cè)內(nèi)容和規(guī)范要求(包括進(jìn)料、過(guò)程、最終)does the inspection instructions include samling quantity,frequency,inspecti
13、onitems and required specifications(incomingprocessout-going).4.5來(lái)料接受計(jì)劃必須包括以下一種或多種方法:1、進(jìn)行統(tǒng)計(jì)數(shù)據(jù)接收與評(píng)價(jià);2、進(jìn)貨檢驗(yàn)和/或試驗(yàn)(根據(jù)性能的抽樣);3、當(dāng)有可接收質(zhì)量性能的記錄時(shí),由第二方或第三方評(píng)審或?qū)徍?。檢檢查查表表供供應(yīng)應(yīng)商商質(zhì)質(zhì)量量審審核核 Checklistsupplier audit供應(yīng)商名稱(chēng)/supplier name:產(chǎn)品型號(hào)/part no:審核日期/audit date:第 3 頁(yè),共 22 頁(yè)the acceptance plan must include one or more
14、of the following:1、receipt andevaluation of statistical data;2、receiving inspection and/or testing(samplingbasedon performance);3、2nd or 3rd party assessments or audits ofcoupled withrecords of acceptable quality performance;4、part evaluation by accreditedlaboratory.4.6在所有要求的檢驗(yàn)和試驗(yàn)完成或必要的報(bào)告收到和驗(yàn)證前,不得將產(chǎn)
15、品放行,除非有可靠追回程序時(shí)才可放行?does the supplier hold product until the required inspections and testshave been completed or necessary reports have been received andverified,except for release under positive recall?4.7供方是否只在文件或控制計(jì)劃中所有要求的各項(xiàng)活動(dòng)已圓滿(mǎn)完成后,產(chǎn)品才發(fā)出?does the supplier assure that no product is dispatched unt
16、il all activities specified inthe document and/or control plan have been satisfactorily completed?4.8在控制計(jì)劃和/或文件化程序中是否具體規(guī)定了標(biāo)識(shí)(如:蓋章、標(biāo)簽、貯存位置等)?is the identification specified in the control plan and/or documented procedures(e.g.stamp marks,tags,storage location.)4.9在生產(chǎn)過(guò)程中是否提供文件表明:只有通過(guò)了檢驗(yàn)和/或試驗(yàn)的材料才能提供給顧客
17、?are there provisions in the process that only material that has passed theinspections and/or test can be provided to the customer?操操 作作 要要 求求/implementation/process questions4.10 是否在整個(gè)生產(chǎn)過(guò)程中都保持了產(chǎn)品適當(dāng)?shù)臋z驗(yàn)和/或試驗(yàn)狀態(tài)的標(biāo)識(shí)?is inspection and/or test status suitably identified throughout the productionprocess?4.
18、11 是否按文件和/或控制計(jì)劃的要求對(duì)產(chǎn)品進(jìn)行檢驗(yàn)/試驗(yàn)?is product inspected/tested as required by documented procedures and/or thecontrol plan?4.12 最終檢驗(yàn)和試驗(yàn)是否根據(jù)文件和/或控制計(jì)劃的要求進(jìn)行?檢檢查查表表供供應(yīng)應(yīng)商商質(zhì)質(zhì)量量審審核核 Checklistsupplier audit供應(yīng)商名稱(chēng)/supplier name:產(chǎn)品型號(hào)/part no:審核日期/audit date:第 4 頁(yè),共 22 頁(yè)is final inspection and testing conducted in ac
19、cordance with documented proceduresand/or the control plan?4.13 對(duì)返工和返修品是否重新進(jìn)行了檢查?is the procedure to re-qualify all reworked/repaired material being followed?4.14 是否進(jìn)行了作業(yè)準(zhǔn)備驗(yàn)證,使用的是哪一種(末件比較/首件檢查)?are job setups verified whenever a setup is performed?Which is used(Last-offpart comparison or first part
20、check)?4.15 供方是否保存了所有檢驗(yàn)和試驗(yàn)的記錄?does the supplier maintain adequate records of all inspections and tests?4.16 檢驗(yàn)和試驗(yàn)記錄是否清楚的表明產(chǎn)品是否已通過(guò)了檢驗(yàn)和/或試驗(yàn)?do inspection and test records clearly show whether the product has passedor failed the inspection and/or test?4.17 記錄是否標(biāo)明負(fù)責(zé)合格產(chǎn)品放行的授權(quán)檢驗(yàn)者?do the records identify t
21、he inspection authority responsible for therelease of the product?4.18必須按要求的頻次對(duì)所有產(chǎn)品進(jìn)行全尺寸檢驗(yàn)和功能驗(yàn)證(按顧客的工程材料及性能標(biāo)準(zhǔn)),其結(jié)果必須可供顧客評(píng)審。A layout inspection and a functional verification(to applicable customerengineering materal and performance standards)shall be performed for allproducts at a established frequen
22、cy,results shall be available forcustomer review.5、產(chǎn)產(chǎn)品品規(guī)規(guī)范范與與圖圖紙紙/Product Specifications&DrawingsNO.文文 件件 要要 求求/document questions評(píng)評(píng)價(jià)價(jià)evaluate記記錄錄/comments 檢檢查查表表供供應(yīng)應(yīng)商商質(zhì)質(zhì)量量審審核核 Checklistsupplier audit供應(yīng)商名稱(chēng)/supplier name:產(chǎn)品型號(hào)/part no:審核日期/audit date:第 5 頁(yè),共 22 頁(yè)5.1是否有顧客規(guī)范的最新修訂版?Is the current revisio
23、n of the customer specification(s)on hand?5.2產(chǎn)品規(guī)范是否正確地反映在供應(yīng)商的圖紙和相關(guān)文件上(如:控制計(jì)劃、操作指導(dǎo)書(shū)、檢驗(yàn)指導(dǎo)書(shū))?Are specifications reflected on supplier drawings and relevant documentscorrectly(eg:control plan,inspection instruction,operation instruction)?5.3供方是否保存了工程更改在生產(chǎn)中實(shí)施日期的記錄?does the supplier maintain a record of t
24、he date on which each change isimplemented in production.5.4對(duì)新/舊規(guī)范生產(chǎn)的產(chǎn)品如何控制?how to control the products between the new/old specifications.操操 作作 要要 求求/implementation/process questions無(wú)無(wú)/none6、過(guò)過(guò)程程監(jiān)監(jiān)控控與與操操作作指指導(dǎo)導(dǎo)書(shū)書(shū)/Process Monitoring&Operator InstructionsNO.文文 件件 要要 求求/document questions評(píng)評(píng)價(jià)價(jià)evaluate記記
25、錄錄/comments6.1每一個(gè)生產(chǎn)崗位是否有有效的工作空間和足夠的照明,以達(dá)到有效的工作環(huán)境?does each workstation provide adequate lighting and sufficient space to promote effectiveworking conditions?6.2是否有一個(gè)用以查證操作工已進(jìn)行了可視樣品、量具和操作指導(dǎo)書(shū)等的培訓(xùn)的系統(tǒng)?Is a system in place to verify operator training on gages,visual aids,and operatorinstructions?6.3新進(jìn)員工(
26、包括轉(zhuǎn)崗員工)是否進(jìn)行培訓(xùn),有無(wú)記錄。檢檢查查表表供供應(yīng)應(yīng)商商質(zhì)質(zhì)量量審審核核 Checklistsupplier audit供應(yīng)商名稱(chēng)/supplier name:產(chǎn)品型號(hào)/part no:審核日期/audit date:第 6 頁(yè),共 22 頁(yè)does the organization provide on-the-job training for personnel in any new ormodified job affecting product quality.Are records of training maintained?6.4操作指導(dǎo)書(shū)、結(jié)構(gòu)圖、檢驗(yàn)指導(dǎo)書(shū)是否受控并且能
27、追趕溯到生產(chǎn)零件的級(jí)別?Operator Instructions,Set-up Sheets and Inspection instructions are controlled andtraceable to the level parts being produced6.5操作和過(guò)程監(jiān)控指導(dǎo)書(shū)是否滿(mǎn)足TS16949/7.5.1.2Operator and process monitoring instructions comply with TS16949/7.5.1.26.6過(guò)程控制中是否使用了統(tǒng)計(jì)技術(shù)(控制圖)?are the statistical techniques used
28、in the process controlling(eg.Control chart)?6.7所有超出控制和不良趨勢(shì)是否都被備注和采取糾正措施?Are trends and out of control situations being noted and corrected?6.8是否按規(guī)定的方法確保所有現(xiàn)場(chǎng)的工程文件都為正確的修訂版本(規(guī)范、PFMEA、控制計(jì)劃、結(jié)構(gòu)圖、操作指導(dǎo)書(shū)、可視輔具)?Is the system being followed to ensure the correct revision level is in place for allengineering d
29、ocuments?(Specifications,PFMEA,Control Plans,Setup Sheets,Operator Instructions,Visual Aids)6.9試生產(chǎn)的資料是否被收集和保存?Has pilot build data been collected and stored?6.10是否有文件化程序規(guī)定對(duì)返工/返修的材料進(jìn)行重新檢查?Is there a procedure to re-qualify all reworked/repaired material?6.11是否有一個(gè)書(shū)面的詳細(xì)的批次管理系統(tǒng)存在,管理系統(tǒng)涉及原材料從進(jìn)料到發(fā)運(yùn)包括離線(xiàn)、返工/
30、返修的操作。A written detailed lot tracebility system exists through all stages of material flow fromincoming to shipping,including off-line and rework/repair operations.檢檢查查表表供供應(yīng)應(yīng)商商質(zhì)質(zhì)量量審審核核 Checklistsupplier audit供應(yīng)商名稱(chēng)/supplier name:產(chǎn)品型號(hào)/part no:審核日期/audit date:第 7 頁(yè),共 22 頁(yè)操操 作作 要要 求求/implementation/proc
31、ess questions6.12 是否在生產(chǎn)、交付的所有階段都有保持了產(chǎn)品的標(biāo)識(shí)?are the identifications maintained during all stages of production,delivery?6.13在每個(gè)工作崗位,操作工是否能很容易地得到可視輔具(包括合適的臨界樣品)和操作指導(dǎo)書(shū),并按其進(jìn)行操作?Are visual aids(including appropriate boundary samples)and operator instructionsreadily accessible by the operators at each stat
32、ion and being followed?6.14 在生產(chǎn)線(xiàn)上是否都可得到好的樣品/不良樣品?它們是否都有狀態(tài)標(biāo)識(shí)?Are all Master Good/Master Bad samples available on line?Are they signed?6.15 操作指導(dǎo)書(shū)是否清晰、易讀、能看得見(jiàn)的?The instructions are legible and visible to the operator.6.16 現(xiàn)場(chǎng)是否有返工和返修指導(dǎo)書(shū)并按其實(shí)施?Are rework and repair procedures in place and being followed?6
33、.17 在生產(chǎn)現(xiàn)場(chǎng)是否劃分出合格品、不合格品、待檢品的區(qū)域,并加以標(biāo)識(shí)。is there an identified area for conforming nonconforming awaiting inspectingmaterial/product,segregated from the manufacturing area?6.18 類(lèi)似產(chǎn)品是否針對(duì)防止混入采取措施。is there action to prevent the similar products from mixing.6.19 檢測(cè)點(diǎn)的設(shè)置是否能有效地阻止不合格品的發(fā)運(yùn)?are inspection point lo
34、cations effective in preventing shipment of nonconforming products?6.20批次可追溯性管理已被證明在使用并有效。The lot traceability is demonstrated to be in place and effective.6.21 零件標(biāo)識(shí)是否存在,并至少包括供應(yīng)商編號(hào),產(chǎn)品編號(hào)和生產(chǎn)日期。檢檢查查表表供供應(yīng)應(yīng)商商質(zhì)質(zhì)量量審審核核 Checklistsupplier audit供應(yīng)商名稱(chēng)/supplier name:產(chǎn)品型號(hào)/part no:審核日期/audit date:第 8 頁(yè),共 22 頁(yè)P(yáng)art
35、 identification is based on PS-4480 with,at a minumum,includesSupplier Code,p/n and run date.6.22 批次數(shù)量大小不超過(guò)8小時(shí)或一天的生產(chǎn)產(chǎn)量中的較小者Lot size is designated as not to exceed 8 hours or 1 days production,whichever issmaller.6.23 在工作現(xiàn)場(chǎng),可追溯性標(biāo)識(shí)是否得到維持并進(jìn)行記錄?are the identification of traceability maitained and record
36、ed on the site?7、Handling and storageNO.文文 件件 要要 求求/document questions評(píng)評(píng)價(jià)價(jià)evaluate記記錄錄/comments7.1材料包括精密的零部件的搬運(yùn)和貯存要求是否被評(píng)審?Have the handling and storage requirements of material,including delicatecomponents,been reviewed?7.2當(dāng)零件或材料有特殊的搬運(yùn)要求時(shí),程序或作業(yè)指導(dǎo)書(shū)中是否清楚地說(shuō)明了搬運(yùn)的方法?When special handling of parts or mate
37、rial is required,the procedures or workinstructions clearly indicate the handling method.7.3供方是否使用合適的貯存場(chǎng)地以防止產(chǎn)品損壞或變質(zhì)?are storage areas appropriate for preventing damage or deterioration of theproduct?7.4供方是否以適宜的時(shí)間間隔檢查庫(kù)存品狀況,以便及時(shí)發(fā)現(xiàn)變質(zhì)情況?is the condition of product in stock assessed at appropriate interv
38、als to detectdeterioration?操操 作作 要要 求求/implementation/process questions 檢檢查查表表供供應(yīng)應(yīng)商商質(zhì)質(zhì)量量審審核核 Checklistsupplier audit供應(yīng)商名稱(chēng)/supplier name:產(chǎn)品型號(hào)/part no:審核日期/audit date:第 9 頁(yè),共 22 頁(yè)7.5材料的貯存是否充分地避免了環(huán)境的影響?Is the storage of material adequate to protect it from environmental factors?7.6零部件的貯存地點(diǎn)是否得到管理和監(jiān)控?Is
39、the storage location for components organized&monitored?7.7是否建立了一些控制方法以消除產(chǎn)品被污染或相似的產(chǎn)品被混合?Have controls been established to eliminate the potential for an operation tocontaminate or mix similar products?8、包包裝裝與與發(fā)發(fā)運(yùn)運(yùn)規(guī)規(guī)范范/Parts Packaging/Shipping SpecificationsNO.文文 件件 要要 求求/document questions評(píng)評(píng)價(jià)價(jià)evalua
40、te記記錄錄/comments8.1下列文件是否存在?The following documentation exists and is included in the plan:Packaging requirements/instructions/包裝指導(dǎo)書(shū)Labeling requirements/instructions/標(biāo)簽指導(dǎo)書(shū)Shipping requirements/instructions/發(fā)運(yùn)指導(dǎo)書(shū)8.2包裝是否按顧客要求已進(jìn)行了測(cè)試,包括按實(shí)際或模擬路線(xiàn)和條件發(fā)運(yùn)后的包裝進(jìn)行測(cè)試?Evidence exists that the packaging has been te
41、sted(as required by the using plant)including test packs shipped over actual or simulated shipping route and conditions8.3在最終檢驗(yàn)和試驗(yàn)后,供方是否采取保護(hù)產(chǎn)品質(zhì)量的措施,合同要求時(shí),這種保護(hù)應(yīng)延續(xù)到交付的目的地?does the supplier arrange for the protection of the quality of product after finalinspection and test,and when contractually specif
42、ied does it extend to includedelivery to destination?檢檢查查表表供供應(yīng)應(yīng)商商質(zhì)質(zhì)量量審審核核 Checklistsupplier audit供應(yīng)商名稱(chēng)/supplier name:產(chǎn)品型號(hào)/part no:審核日期/audit date:第 10 頁(yè),共 22 頁(yè)8.4供方是否建立支持百分之百按期裝運(yùn)的系統(tǒng)以滿(mǎn)足顧客生產(chǎn)的要求?has the supplier established a system to support 100%on-time shipments to meetcustomer production requiremen
43、ts?8.5如果未能保持百分之百按期裝運(yùn),供方是否實(shí)施糾正措施以改進(jìn)交付能力并與顧客就交付問(wèn)題進(jìn)行信息溝通?if the suppliers delivery performqnce is not 100%to schedule,is there evidence ofimplemented corrective actions,and of communicatin regarding delivery probleminformation to the customer?8.6是否有含有第二條路線(xiàn)以及承運(yùn)商的應(yīng)急計(jì)劃。A contingency plan exists which incl
44、udes secondary routes and carriers,as well as,logistics for expited shipments操操 作作 要要 求求/implementation/process questions8.7包裝和標(biāo)簽是否符合顧客的最新要求?Packaging and labeling conforms to the latest customer standard8.8檢查包裝損壞或被污染的檢查計(jì)劃Inspection plan which identifies damaged or contaminated containers for remova
45、lfrom service8.9所有運(yùn)輸容器、方法和標(biāo)準(zhǔn)包裝已經(jīng)過(guò)顧客材料部門(mén)主管的批準(zhǔn)。All shipping containers,methods and standard packs have been approved by theusing plants Materials Mgr.8.10發(fā)運(yùn)必須遵守先進(jìn)先出的庫(kù)存管理系統(tǒng)。Shipments must conform to FIFO inventory control system9、異異常常處處理理 檢檢查查表表供供應(yīng)應(yīng)商商質(zhì)質(zhì)量量審審核核 Checklistsupplier audit供應(yīng)商名稱(chēng)/supplier name:
46、產(chǎn)品型號(hào)/part no:審核日期/audit date:第 11 頁(yè),共 22 頁(yè)NO.文文 件件 要要 求求/document questions評(píng)評(píng)價(jià)價(jià)evaluate記記錄錄/comments9.1如果發(fā)生顧客抱怨,是否有一個(gè)保護(hù)顧客利益的程序文件?Are there procedures in place to protect customer in the event of CustomerComplaint?9.2那些文件是否能確保完全隔離所有可疑品:包括顧客處的、公司內(nèi)的、在運(yùn)輸途中的或在倉(cāng)庫(kù)中的?Do these procedures ensure complete isol
47、ation of suspect material,at bothcustomer and supplier locations?At transportation and storage locations?9.3問(wèn)題的解決辦法是否采用8D或其它方法(如:顧客的要求方法、7-步法、5-步法)Does the problem soxxing system incorporate the 8-D,or like processes(I.E.Customer specific methods;7-Step,5 Phase,etc.)?9.4是否建立并實(shí)施了關(guān)于不合格/可疑的材料/產(chǎn)品的標(biāo)識(shí)、記錄、
48、評(píng)價(jià)、隔離和處置的程序文件?are procedures established and implemented to address nonconforming/suspectmaterial or product regarding:identification,documentation,evaluation,segregation(when practical),disposition?9.5是否對(duì)所有不合格的、可疑的材料或產(chǎn)品和隔離區(qū)提供可視標(biāo)識(shí)?is visual identification of any nonconforming material or product and
49、 quarantineareas evident?9.6是否清楚地定義出評(píng)審和處置不合格/可疑產(chǎn)品的職責(zé)與權(quán)限?are there clear definitions for responsibilities for review and disposition ofnonconforming and suspect product?9.7是否對(duì)不合格品進(jìn)行量化和分析,建立優(yōu)先減少計(jì)劃并跟蹤計(jì)劃的實(shí)施進(jìn)展情況?is nonconforming product quantified and analyzed and is a prioritized reduction planin place?
50、檢檢查查表表供供應(yīng)應(yīng)商商質(zhì)質(zhì)量量審審核核 Checklistsupplier audit供應(yīng)商名稱(chēng)/supplier name:產(chǎn)品型號(hào)/part no:審核日期/audit date:第 12 頁(yè),共 22 頁(yè)9.8是否所有不合格都被記錄并進(jìn)行收集和缺陷分析?are all nonconformances products recorded,collected and defectanalyzed?9.9在工作場(chǎng)所是否易于得到返工指導(dǎo)書(shū),并為相關(guān)人員所使用?are the repair/rework instructions accessible and utilized by theapp
51、ropriate personnel?9.10是否記錄了讓步接受和返修產(chǎn)品的實(shí)際狀況?are accepted nonconformities and repairs documented to record theactual condition of the product?9.11供方是否確保在收到顧客授權(quán)之后才發(fā)運(yùn)不合格的材料?does the supplier ensure that customer authorization is receivedprior to shipping nonconforming material?9.12發(fā)運(yùn)的經(jīng)授權(quán)的不合格材料是否在每個(gè)包裝箱上都
52、有適當(dāng)?shù)挠涗??is material shipped on an authorization properly identified on eachshipping container?9.13是否有對(duì)質(zhì)量成本控制的相關(guān)文件規(guī)定:is the controlled cost of qualuty specified in related documents?9.14是否依據(jù)文件的規(guī)定實(shí)施了相應(yīng)的質(zhì)量成本控制?is the controlled cost of qualuty implemented according as thedocument requirments?9.15是否對(duì)不良質(zhì)量
53、成本建立了優(yōu)先減少計(jì)劃?is a prioritized reduction plan established with the cost of poorquality?10、預(yù)預(yù)防防/預(yù)預(yù)知知性性維維護(hù)護(hù)計(jì)計(jì)劃劃/Preventive/predictiveMaintenance Plans 檢檢查查表表供供應(yīng)應(yīng)商商質(zhì)質(zhì)量量審審核核 Checklistsupplier audit供應(yīng)商名稱(chēng)/supplier name:產(chǎn)品型號(hào)/part no:審核日期/audit date:第 13 頁(yè),共 22 頁(yè)NO.文文 件件 要要 求求/document questions評(píng)評(píng)價(jià)價(jià)evaluate記記
54、錄錄/comments10.1生產(chǎn)的設(shè)備、工裝、量具,是否有清單?Is there a list of tooling,equipment and fixtures used for product?10.2所有工裝、量具和主要設(shè)備是否都有包括在預(yù)防性維護(hù)計(jì)劃中。All tooling,gages,and capital equipment are included in the PM programs10.3所有設(shè)備、工裝和量具是否與清單相一致?Is all equipment,gauging and tooling the same as will be used in productio
55、n?10.4所有工裝、量具和主要設(shè)備是否都被清晰地標(biāo)識(shí)?Are all tools,equipment and fixtures clearly identified?10.5所有設(shè)備和工裝都存在文件化的預(yù)防維護(hù)計(jì)劃?A documented Preventive Maintenance plan exists for all equipment and tooling10.6 The PM plan includes:/預(yù)防性維護(hù)計(jì)劃包括:Setup the maintenance items for machines,tools and other equipment/制定機(jī)器、工裝和其它
56、設(shè)備的維護(hù)項(xiàng)目。A schedule of planned maintenance including maintaining period/包括時(shí)間周期的維護(hù)計(jì)劃表。A schedule of planned maintenance including responsible party/維護(hù)計(jì)劃表包括責(zé)任部門(mén)。Maintenance instructions based on manufacturers recommendation or partperformance/建立在制造商的建議和零件性能基礎(chǔ)上的維護(hù)指導(dǎo)書(shū)10.7 標(biāo)識(shí)關(guān)鍵設(shè)備并制定應(yīng)急計(jì)劃以防止由于設(shè)備的故障對(duì)顧客造成損失。K
57、ey equipment has been identified and contingency plans are in place that willprotect the customer form loss of production due to failure of this equipment 檢檢查查表表供供應(yīng)應(yīng)商商質(zhì)質(zhì)量量審審核核 Checklistsupplier audit供應(yīng)商名稱(chēng)/supplier name:產(chǎn)品型號(hào)/part no:審核日期/audit date:第 14 頁(yè),共 22 頁(yè)10.8 是否有關(guān)鍵設(shè)備備件清單,是否存有關(guān)鍵生產(chǎn)設(shè)備的零配件。is ther
58、e a key equipment replacement parts list and is the replacement parts forkey equipment is available?操操 作作 要要 求求/implementation/process questions10.9 預(yù)防/預(yù)知性維護(hù)系統(tǒng)是否得到實(shí)施?Is the preventive/predictive maintenance system being followed?10.10 是否能對(duì)易損件充分保證其可得性?Is there an adequate supply of perishable tooling
59、 available in house?10.11 所有好的樣品和壞的樣品是否都被列入了預(yù)防維護(hù)計(jì)劃?Are all Master Good/Master Bad samples on the Preventative Maintenanceschedule?11、檢檢測(cè)測(cè)量量具具的的評(píng)評(píng)價(jià)價(jià)/Gage&Check Fixture EvaluationNO.文文 件件 要要 求求/document questions評(píng)評(píng)價(jià)價(jià)evaluate記記錄錄/comments11.1所有用于計(jì)量性數(shù)據(jù)測(cè)量的檢測(cè)設(shè)備是否都進(jìn)行了R&R分析并是可接受的(30%)?Were gage R&Rs perform
60、ed and acceptable(30%)on all variable data measuringinstruments?11.2所有用于計(jì)數(shù)性數(shù)據(jù)測(cè)量的檢測(cè)設(shè)備是否都進(jìn)行了R&R分析并是可接受的(按AIAG測(cè)量系統(tǒng)分析手冊(cè))?Were gage R&Rs performed and acceptable(ref.AIAG Measurement SystemsAnalysis manual)on all attribute measuring instruments?11.3 是否存在一個(gè)系統(tǒng),用以確保所有檢測(cè)量量具和設(shè)備都得到校正和標(biāo)識(shí)?檢檢查查表表供供應(yīng)應(yīng)商商質(zhì)質(zhì)量量審審核核 Ch
61、ecklistsupplier audit供應(yīng)商名稱(chēng)/supplier name:產(chǎn)品型號(hào)/part no:審核日期/audit date:第 15 頁(yè),共 22 頁(yè)Is a system in place to ensure all gages and test equipments are identified andcalibrated?11.4 是否有檢驗(yàn)測(cè)量和試驗(yàn)設(shè)備的清單,以及其校正計(jì)劃?are there a list of all gages and test equipments,a plan about the calibration?操操 作作 要要 求求/impleme
62、ntation/process questions11.5 對(duì)所有樣件是否有一個(gè)管理系統(tǒng)?are there a management system to all masters?11.6 是否所有的檢測(cè)量具和設(shè)備都得到了適宜的校正并可追溯到一個(gè)已知的標(biāo)準(zhǔn)?Are all gages and test equipments properly calibrated and traceable to a knownstandard?11.7 是否所有的檢測(cè)量具和設(shè)備都有正確的標(biāo)識(shí)?are all gages and test equipments correctly identified?11.8
63、 從校正記錄上是否顯示出上下兩次校正日期?The calibration records indicate last/next caliration date?12、產(chǎn)產(chǎn)能能驗(yàn)驗(yàn)證證/Line Speed&Capacity VerifiedNO.文文 件件 要要 求求/document questions評(píng)評(píng)價(jià)價(jià)evaluate記記錄錄/comments12.1對(duì)每臺(tái)設(shè)備是否進(jìn)行了設(shè)備過(guò)程能力研究并形成文件?Has a machine process capability study been done and documented on all pieces ofequipment?檢檢查查
64、表表供供應(yīng)應(yīng)商商質(zhì)質(zhì)量量審審核核 Checklistsupplier audit供應(yīng)商名稱(chēng)/supplier name:產(chǎn)品型號(hào)/part no:審核日期/audit date:第 16 頁(yè),共 22 頁(yè)12.2 是否至少每月一次地將生產(chǎn)產(chǎn)能與顧客訂單進(jìn)行比較?Is there a plan in place to compare your capacity against customer releases at leastmonthly?12.3 是否已確定出裝配過(guò)程的最高的三個(gè)瓶頸?Have the top three bottlenecks in the assembly proces
65、s been identified?12.4 是否制定了應(yīng)急計(jì)劃以防止設(shè)備出現(xiàn)故障時(shí)能維持兩天的生產(chǎn)?Have contingency plans been established to support production for 2 days in theevent of equipment breakdown?操 作 要 求/implementation/process questions12.5 產(chǎn)能是否能足夠滿(mǎn)足顧客的最大生產(chǎn)要求?Is capacity sufficient to meet the quoted peak production demands?13、工工程程標(biāo)標(biāo)準(zhǔn)準(zhǔn)
66、/Enginering Standards IdentifiedNO.文文 件件 要要 求求/document questions評(píng)評(píng)價(jià)價(jià)evaluate記記錄錄/comments13.1所有應(yīng)用工程標(biāo)準(zhǔn)的現(xiàn)行受控清單是否存在?A current,controlled list of all applicable engineering standards exists13.2 及時(shí)評(píng)審、分發(fā)和執(zhí)行所有顧客工程標(biāo)準(zhǔn)/規(guī)范的更改的程序是否存在?.a procedure to ensure the timely review,distribution,and implementation of allcustomer engineering standards/specificationsand changes.is in place QS4.5.2.113.3 所有更改的執(zhí)行日期的記錄是否存在?A record of implementation dates for all changes exists and is current.13.4 更改是否包括對(duì)所有相關(guān)文件的更改?Imple
- 溫馨提示:
1: 本站所有資源如無(wú)特殊說(shuō)明,都需要本地電腦安裝OFFICE2007和PDF閱讀器。圖紙軟件為CAD,CAXA,PROE,UG,SolidWorks等.壓縮文件請(qǐng)下載最新的WinRAR軟件解壓。
2: 本站的文檔不包含任何第三方提供的附件圖紙等,如果需要附件,請(qǐng)聯(lián)系上傳者。文件的所有權(quán)益歸上傳用戶(hù)所有。
3.本站RAR壓縮包中若帶圖紙,網(wǎng)頁(yè)內(nèi)容里面會(huì)有圖紙預(yù)覽,若沒(méi)有圖紙預(yù)覽就沒(méi)有圖紙。
4. 未經(jīng)權(quán)益所有人同意不得將文件中的內(nèi)容挪作商業(yè)或盈利用途。
5. 裝配圖網(wǎng)僅提供信息存儲(chǔ)空間,僅對(duì)用戶(hù)上傳內(nèi)容的表現(xiàn)方式做保護(hù)處理,對(duì)用戶(hù)上傳分享的文檔內(nèi)容本身不做任何修改或編輯,并不能對(duì)任何下載內(nèi)容負(fù)責(zé)。
6. 下載文件中如有侵權(quán)或不適當(dāng)內(nèi)容,請(qǐng)與我們聯(lián)系,我們立即糾正。
7. 本站不保證下載資源的準(zhǔn)確性、安全性和完整性, 同時(shí)也不承擔(dān)用戶(hù)因使用這些下載資源對(duì)自己和他人造成任何形式的傷害或損失。
最新文檔
- 市教育局冬季運(yùn)動(dòng)會(huì)安全工作預(yù)案
- 2024年秋季《思想道德與法治》大作業(yè)及答案3套試卷
- 2024年教師年度考核表個(gè)人工作總結(jié)(可編輯)
- 2024年xx村兩委涉案資金退還保證書(shū)
- 2024年憲法宣傳周活動(dòng)總結(jié)+在機(jī)關(guān)“弘揚(yáng)憲法精神推動(dòng)發(fā)改工作高質(zhì)量發(fā)展”專(zhuān)題宣講報(bào)告會(huì)上的講話(huà)
- 2024年XX村合作社年報(bào)總結(jié)
- 2024-2025年秋季第一學(xué)期初中歷史上冊(cè)教研組工作總結(jié)
- 2024年小學(xué)高級(jí)教師年終工作總結(jié)匯報(bào)
- 2024-2025年秋季第一學(xué)期初中物理上冊(cè)教研組工作總結(jié)
- 2024年xx鎮(zhèn)交通年度總結(jié)
- 2024-2025年秋季第一學(xué)期小學(xué)語(yǔ)文教師工作總結(jié)
- 2024年XX村陳規(guī)陋習(xí)整治報(bào)告
- 2025年學(xué)校元旦迎新盛典活動(dòng)策劃方案
- 2024年學(xué)校周邊安全隱患自查報(bào)告
- 2024年XX鎮(zhèn)農(nóng)村規(guī)劃管控述職報(bào)告