壓縮包內(nèi)含有CAD圖紙和說(shuō)明書(shū),均可直接下載獲得文件,所見(jiàn)所得,電腦查看更方便。Q 197216396 或 11970985
消聲器前蓋沖壓工藝及其模具設(shè)計(jì)
摘 要
本設(shè)計(jì)分析消音器前蓋沖壓工藝, 確定工藝方案及模具結(jié)構(gòu), 論述了級(jí)進(jìn)模的設(shè)計(jì)過(guò)程, 同時(shí)還介紹了模具關(guān)鍵部位的結(jié)構(gòu)設(shè)計(jì),如:凸模、凹模、凸模固定板、墊板、卸料板、彈簧、擋料銷(xiāo)、導(dǎo)正銷(xiāo)等。模架采用標(biāo)準(zhǔn)模架,選用了合適的沖壓設(shè)備。設(shè)計(jì)中對(duì)工作零件和壓力機(jī)規(guī)格均進(jìn)行了必要的校核計(jì)算, 實(shí)踐證明:模具結(jié)構(gòu)合理,生產(chǎn)的零件符合要求。
關(guān)鍵詞:級(jí)進(jìn)模,浮頂裝置,沖孔,拉伸,翻孔,落料
The front cover of the muffler stamping process analysis and mold design
Abstract
This project analysis damper front cover ramming craft, the definite craft plan and the mold structure, elaborated the level to enter mold's design process, meanwhile introduced the mold essential spot structural design, for example: The plunger, the lower die, the plunger dead plate, the backing strip, unload the yard lumber, the spring, to keep off the material to sell, to lead are selling and so on. The pould frame uses the standard pould frame, has selected the appropriate ramming equipment. In the design carried on the essential examination computation to the work components and the press specification, the practice had proven: The mold structure is reasonable, the production components meet the requirement.
Keywords : Progressive dies, Floating roof device, Punching, Stretching, Plunge, Cut