購買設(shè)計請充值后下載,,資源目錄下的文件所見即所得,都可以點開預(yù)覽,,資料完整,充值下載就能得到。。?!咀ⅰ浚篸wg后綴為CAD圖,doc,docx為WORD文檔,【有不明白之處,可咨詢QQ:1304139763】
目 錄 1 緒 論 1 2 沖壓工藝分析 4 3 主要工藝參數(shù)的計算 5 3 1 翻邊工藝分析 5 3 2 修邊余量的確定 6 3 3 毛坯尺寸計算 6 3 3 1 確定拉深件毛坯尺寸計算的依據(jù) 6 3 3 2 該零件毛坯尺寸的計算 7 3 4 排樣 7 3 5 確定拉深系數(shù)及拉深次數(shù) 8 4 確定工藝方案及模具結(jié)構(gòu)形式 9 4 1 工藝方案的確定 9 4 2 模具結(jié)構(gòu)形式的選擇與確定 9 5 沖壓設(shè)備的選擇 11 5 1 沖裁工序總力的計算 11 5 2 初選壓力機 13 5 3 壓力中心的計算 13 6 模具主要零件的設(shè)計與標(biāo)準(zhǔn)化 14 6 1 工作零部件刃口尺寸的計算 14 6 1 1 落料凸凹模刃口尺寸計算 14 6 1 2 沖孔凸凹模刃口尺寸計算 14 6 1 3 拉深凸 凹模尺寸的計算 15 6 1 4 翻邊凸 凹模刃口尺寸的計算 16 6 2 工作零部件的設(shè)計與標(biāo)準(zhǔn)化 17 6 2 1 落料凹模的設(shè)計 17 6 2 2 沖孔凸模的設(shè)計 18 6 2 3 拉深凸模的設(shè)計 19 6 2 4 翻邊凹模的設(shè)計 20 6 2 5 凹模鑲塊 翻邊凸模 沖孔凹模 的設(shè)計 20 6 2 6 凸凹模 落料凸模 拉深凹模 的設(shè)計 21 6 3 定位裝置的設(shè)計與標(biāo)準(zhǔn)化 21 6 3 1 固定擋料銷的設(shè)計與標(biāo)準(zhǔn)化 21 6 4 標(biāo)準(zhǔn)模架的選用 22 6 5 卸料裝置的設(shè)計與標(biāo)準(zhǔn)化 24 6 5 1 打桿的設(shè)計與標(biāo)準(zhǔn)化 24 6 5 2 卸料螺釘?shù)脑O(shè)計與標(biāo)準(zhǔn)化 24 6 5 3 卸料板的設(shè)計與標(biāo)準(zhǔn)化 24 6 5 4 彈簧的選取 25 7 模具總裝圖及其工作過程分析 28 7 1 模具工作過程分析 28 7 2 模具總裝圖 28 8 結(jié)論 31 致謝 32 參 考 文 獻(xiàn) 33 軸碗沖壓工藝及模具設(shè)計 摘要 本課題是對軸碗落料拉深沖孔翻孔復(fù)合模模具設(shè)計 其中分別對模具 的工作零部件等六大類零部件作詳細(xì)設(shè)計 設(shè)計的主要內(nèi)容包括沖裁件的工藝 分析及工藝方案的確定 工藝計算 沖裁模具的設(shè)計 模具的安裝與調(diào)整等 在工藝計算部分要對排樣設(shè)計與計算 沖壓力的計算 模具壓力中心的確 定 凸凹模尺寸并確定制造公差的計算與計算等內(nèi)容詳細(xì)計算 在沖裁模的設(shè)計部分要對工作零件 定位零件 卸料與頂件零件 導(dǎo)向零 件連接與固定零件等結(jié)構(gòu)進行詳細(xì)的分析設(shè)計 要在設(shè)計過程中了解模具的工 作過程和注意標(biāo)準(zhǔn)的選用 對復(fù)合沖裁模的結(jié)構(gòu)有進一步的了解 模具的安裝與調(diào)試部分要注意導(dǎo)柱模具與無導(dǎo)柱模具的安裝方法及順序 通過模具的安裝 了解模具的組成及各部分零部件的作用等 注意模具安裝過 后的試沖過程中常見的缺陷與解決方法等 通過這次畢業(yè)設(shè)計要對復(fù)合模具有更進一步的了解 在設(shè)計時要注意模具 結(jié)構(gòu)簡單 模具使用方便 模具壽命高等問題 并且要提高生產(chǎn)效率 保證產(chǎn) 品的質(zhì)量 關(guān)鍵詞 落料拉深沖孔翻邊 試沖 間隙配合 過渡配合 Abstract This lesson a molding tool for is fall to anticipate to pull to the stalk bowl deep blunt the bore turn over bore compound mold molding tool design among them distinguish to wait to the work zero parts of the molding tool six the parts of big zeros make the detailed design The main contents of designing includes to wash to cut a piece craft analysis and craft projects really settle craft calculation the gearing of the design molding tool that wash to cut the molding tool and adjust etc Compute in the craft the part want to be to the row kind design and calculation wash the calculation molding tool pressure of the pressure center to really settle convex and cave mold size and make sure the calculation that make the business trip and compute the detailed calculation in contents in etc Cut the mold to want at the design part that wash to the work spare parts position the spare parts and unload to anticipate with a spare parts lead to spare parts conjunction with fix spare parts etc construction the proceeding the detailed analysis design Want to be in design process work process of understanding the molding tool with notice to choose to use standardly to reunite the construction that wash the understanding that cut the mold further have The gearing of the molding tool with adjust to try the part want to notice to lead the pillar molding tool to lead the pillar molding tool with gearing method and sequences that have nos passing the gearing of the molding tool understanding the molding tool constitute and function etc of each parts of the parts of zeros Noticing the molding tool installs to try to wash the familiar blemish of inside of process later on and solution method etc Pass this time graduate the design want to have the nearer and one step understanding to the compound molding tool while designing to notice the molding tool construction simple molding tool usage convenience high etc in life span in molding tool problem And increase production efficiency guarantee the quantity of the product Keyword Fall to anticipate to pull deep blunt bore to turn over a side Try to blunt Cleft match transition match